Skip to content
https://abc.microfintool.com/

Mobile & Accessories

  • Welcome to ABC Tool: Your Ultimate Portal for Smartphones and Accessories
  • About / Contect
    • PRIVACY POLICY
  • Blog
After nearly breaking, NASA’s Deep Space Network “worked well” on Artemis II

After nearly breaking, NASA’s Deep Space Network “worked well” on Artemis II

Posted on June 11, 2026 By safdargal12 No Comments on After nearly breaking, NASA’s Deep Space Network “worked well” on Artemis II
Blog

[ad_1]

“Once that is in place, as we move forward with new mission commitments, we will just be more focused, I think, and more process-oriented in being able to commit to new missions or not,” Heckler said.

Key antenna offline

One constraint on the DSN is an accident last year that knocked one of the network’s three 70-meter (230-foot) antennas offline at the Goldstone Deep Space Communications Complex near Barstow, California. This antenna, along with similar ones in Spain and Australia, is used to communicate with some of NASA’s most distant missions.

The 70-meter dish was tracking NASA’s Juno spacecraft at Jupiter last September when it “over-rotated” and damaged cables and water lines in the facility’s fire suppression system. An estimated 200,000 gallons of water flooded the base of the antenna. The water contained glycol, causing it to be classified as an environmental hazard, officials wrote in a report after investigating the accident. The resulting flooding rendered the antenna inoperable.

Investigators cited several technical and process causes. After troubleshooting a problem with the antenna’s emergency stops, technicians at Goldstone “overrode and bypassed multiple safeguards that normally would have prevented over-rotation,” officials wrote in the report.

“The investigation revealed inadequate training, insufficient written procedures, a reliance on undocumented behaviors and tacit knowledge, and deficiencies in the antenna’s control logic,” officials wrote. “In addition to the root causes listed above, the hydraulic limit system—the final fail safe against over-rotation—was discovered to have been severely damaged to the point of inoperability in an unknown and undocumented prior incident.”

Work logs indicated the hydraulic limit system was last tested in 2004.

NASA officials estimate it will cost between $4.1 million and $4.6 million to repair and restore the antenna to service. “Our plan for that system is to combine any of the remediation after the mishap with an already planned upgrade cycle that will keep that system down into 2028,” Heckler said.

[ad_2]

Source link

Post Views: 23

Post navigation

❮ Previous Post: Travel Locally, Where You Are
Next Post: Elon Musk’s SpaceX Is Going Public: Live Updates About What This Means for You ❯

You may also like

Rumor claims Apple is unsure of MagSafe’s future
Blog
Rumor claims Apple is unsure of MagSafe’s future
April 29, 2026
Snapdragon 8 Elite Gen 5 vs Dimensity 9500: The performance gap shrinks
Blog
Snapdragon 8 Elite Gen 5 vs Dimensity 9500: The performance gap shrinks
April 26, 2026
Huawei Pura X Max will have a stylus that supports AI features
Blog
Huawei Pura X Max will have a stylus that supports AI features
April 16, 2026
Android Canary’s May release is going hard on the blur effects
Blog
Android Canary’s May release is going hard on the blur effects
May 14, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Fix Outlook for Mac 16.110 Missing Email History
  • Anthropic’s Claude Tag: Smarter Slack Assistant
  • Google Home Facial Recognition Update Boosts Accuracy
  • Meta Pauses Employee Tracking After Data Leak
  • US Accelerates Post-Quantum Cryptography Deadline to 2030

Recent Comments

  1. ALEXAnync on Meta steals a tactic from Tesla and builds data centers in tents
  2. ALEXAnync on The Delivery You Didn’t Order: Breaking Down the ‘Free Phone’ Scam
  3. Pakistan's Football Industry: Complete Guide (2026) – Manufacturing, Exports, Business & Future Growth (Part-1) - Micro Finance Tool on WhatsApp is now testing its subscription service, here's what you get and how much it costs
  4. Budget Calculator: Your Complete Guide to Better Money Management - Micro Finance Tool on US Accelerates Post-Quantum Cryptography Deadline to 2030
  5. Samsung’s upcoming foldables leak in a very interesting size comparison - ABC Tool on iPhone 18 Pro camera upgrade 'confirmed' by another rumor

Archives

  • June 2026
  • May 2026
  • April 2026

Categories

  • Blog

Copyright © 2026 Mobile & Accessories.

Theme: Oceanly News by ScriptsTown