Skip to content

ABC Tool

  • Home
  • About / Contect
    • PRIVACY POLICY
Data center guzzled 30 million gallons of water and nobody noticed for months

Data center guzzled 30 million gallons of water and nobody noticed for months

Posted on May 12, 2026 By safdargal12 No Comments on Data center guzzled 30 million gallons of water and nobody noticed for months
Blog

In a letter to Congress last month, more than 120 organizations advocating against rushed data center developments warned lawmakers that it’s not enough to focus legislation on addressing spiking electricity bills.

“Water use is equally alarming,” among other harms, groups said.

“In drought-prone regions,” groups explained, data centers consuming up to 5 million gallons a day strain “drinking water supplies, agriculture, and ecosystems.” Meanwhile, closed-loop systems “require the use of toxic chemicals that, if not properly disposed of, can eventually flow and pollute water ways.”

To avoid disastrous consequences for the country’s water supply, groups recommended that Congress pass laws requiring comprehensive environmental reviews prior to construction. They also want Congress to commit to rejecting “any legislation that would fast-track permitting and development for hyperscale, artificial intelligence, and other conventional data centers” through the end of this legislative session.

Some efforts to protect water resources have had limited success, as backlash over secretive deals allowing data center developments without public notice increases.

In Utah, one hyperscale data center in Box Elder County withdrew an application to transfer 1,900 acre-feet of water from a ranch to their facility. About 4,000 residents paid about $15 each to file notices of opposition to block that request, the Salt Lake Tribune reported. But although that battle was won, residents expect the larger fight to be far from over.

As the war against data centers rages on beyond Utah, the Salt Lake Tribune editorial board published an op-ed, warning that officials risk eroding trust the more they shrug off residents’ reasonable concerns about things like water supplies, electric bills, air quality, and quality of life.

“Even if the data center isn’t as dreadful as feared—or if it never is actually built—the stench attached to the rushed and secret political process will take a very long time to dissipate,” the editorial board wrote. “If it ever does.”



Source link

Post Views: 4

Post navigation

❮ Previous Post: Bravo is creating unscripted microdramas for the Peacock app
Next Post: Leaker showcases ‘final’ iPhone 18 Pro design ❯

You may also like

Renders show the Motorola Razr 70 in a new color, Pantone Bright White
Blog
Renders show the Motorola Razr 70 in a new color, Pantone Bright White
April 15, 2026
Hello Developer: March 2025
Blog
Hello Developer: March 2025
April 27, 2026
OnePlus Watch 4 leak reveals colors and global availability
Blog
OnePlus Watch 4 leak reveals colors and global availability
April 16, 2026
Today’s NYT Connections Hints, Answers for May 10 #1064
Blog
Today’s NYT Connections Hints, Answers for May 10 #1064
May 9, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Sony Xperia 1 VIII unveiled with larger 48MP telephoto sensor, Snapdragon 8 Elite Gen 5
  • Google’s Chromebook reassurance includes a Googlebooks catch
  • Today’s NYT Connections Hints, Answers for May 14 #1068
  • Solar drone with jumbo jet wingspan broke a flight record—then it crashed
  • Meta won’t let you block its AI account on Threads

Recent Comments

No comments to show.

Archives

  • May 2026
  • April 2026

Categories

  • Blog

Copyright © 2026 ABC Tool.

Theme: Oceanly News by ScriptsTown