Skip to content
https://abc.microfintool.com/

Mobile & Accessories

Smartphone Reviews, Specs, Comparisons & Electronics Guides

  • Welcome to ABC Tool: Your Ultimate Portal for Smartphones and Accessories
  • PRIVACY POLICY
  • Blog
  • Contact
We managed to glean some interesting details about the Artemis III mission

We managed to glean some interesting details about the Artemis III mission

Posted on June 11, 2026October 10, 2026 By Muhammad Safdar No Comments on We managed to glean some interesting details about the Artemis III mission
Blog

Everything you need to know about we managed to glean some interesting.

[ad_1]

Ars: You’re flying Artemis III without an ICPS upper stage because you don’t need the performance to reach low-Earth orbit. But you do need a second stage simulator. What’s the status of that?

Parsons: That, to me, is really cool. It’s called a spacer, and we already have the design done. Metal is already being bump-formed at United Launch Alliance, and then we’re going to weld it in-house at Marshall Space Flight Center. We expect it to show up at Kennedy Space Center no later than December, and then we’ll stack Orion on top of that. We’re in really good shape with that, and I’m pretty psyched with the progress.

Ars: So it sounds like the rocket and Orion should be good to go by mid-2027. Let’s talk about the other parts, the two lunar landers and their launch vehicles. Starting with Blue Origin, you called the prototype lander they’re flying for Artemis III a “lander test article” during your remarks today. What does that mean, exactly?

Parsons: It’s in between Mk 1 and Mk 2. It’s the same lunar crew module, which is really the most important aspect—same avionics, same flight software, so we’re going to get all of that component testing done. This will be the first production article of the lunar crew module, so we’re also going to have the ECLSS system (environmental control and life support).

The primary differences between this test article and the final lander will be the BE-7 engines, so you’re not going to have cryogenics on this test. What we’re going to use is storable propellants and a reaction control system because they don’t need the big thrust that’s needed to go to and from the Moon. That also gives us some time to really dial in what we call the dual-launch campaign. That’s going to be something to really highly choreograph as we go into the Artemis IV missions and beyond.

Blue Origin’s Blue Moon MK1 lander, seen in the center, is taller than NASA’s Apollo lunar lander, currently the largest spacecraft to have landed on the Moon. Blue Moon MK2 is even larger, but all three landers are dwarfed in size by SpaceX’s Starship.

Credit: Blue Origin

Blue Origin’s Blue Moon MK1 lander, seen in the center, is taller than NASA’s Apollo lunar lander, currently the largest spacecraft to have landed on the Moon. Blue Moon MK2 is even larger, but all three landers are dwarfed in size by SpaceX’s Starship. Credit: Blue Origin

Ars: Can the Blue Origin lander for Artemis III be launched on the existing 7×2 variant of the New Glenn rocket?

Parsons: Yes.

Ars: You and other NASA officials expressed a lot of confidence in New Glenn being ready to launch this vehicle next year, even after the pad explosion a couple of weeks ago. Is there a decision point at which you have to make a go-or-no-go call on whether to fly the Artemis III test lander on New Glenn or to consider other rockets?

Parsons: So is there a decision point…

Ars: Like if you get to October or November of this year, and Blue Origin’s launch pads for New Glenn are nowhere near ready.

Parsons: I think you’ve heard from Dave Limp, CEO of Blue Origin, and Jeff Bezos, and they are all in. The other thing to take into account is they had already started their second pad, so they’re about a year into that development timeframe. It’s going to be a dual path. They’re really getting in and clearing out SLC-36 right now, and a lot of the key hardware is in really good shape.


[ad_2]
Source link

More on we managed to glean some interesting

Stay tuned for updates on we managed to glean some interesting as the story develops. Related: Mobile & Accessories.

Frequently Asked Questions

What is the spacer for Artemis III?

A second stage simulator needed because Artemis III flies without the ICPS upper stage. The design is done, metal is already being bump-formed at United Launch Alliance, and it will be welded in-house at Marshall Space Flight Center.

When will the spacer reach Kennedy Space Center?

No later than December, after which Orion will be stacked on top of it.

When should the Artemis III rocket and Orion be ready?

Parsons expects the rocket and Orion to be good to go by mid-2027.

What is Blue Origin's prototype lander for Artemis III?

Parsons called it a lander test article, describing it as something in between the Mk1 and Mk2 designs.

Views: 66

Post navigation

❮ Previous Post: Anthropic’s Dario Amodei has just one direct report
Next Post: History of Game Console Web Browsers: Evolution & Tech ❯

You may also like

ChatGPT Creator OpenAI Could Go Public Soon in Major Market Move
Blog
ChatGPT Creator OpenAI Could Go Public Soon in Major Market Move
May 21, 2026
Today’s NYT Mini Crossword Answers for June 13
Blog
Today’s NYT Mini Crossword Answers for June 13
June 13, 2026
Hello Developer: May 2025
Blog
Hello Developer: May 2025
April 26, 2026
Soundcore P41i earbuds drop to their all-time low price of .99
Blog
Soundcore P41i earbuds drop to their all-time low price of $49.99
May 20, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • OnePlus 16 Launch Date, Price, Specs: Everything Confirmed for 2026
  • Best 5G Phones 2026 for USA, UK & Europe (Every Budget)
  • Best Foldable Phones 2026: Z Fold 8 vs Pixel 11 Pro Fold vs Razr
  • Google Pixel 10 Review (2026): Still Worth $799?
  • iPhone 16 vs iPhone 17: Should You Upgrade in 2026? (Honest Answer)

Recent Comments

  1. I Hiked Using Robot Legs in the Grand Canyon. I Didn’t Even Need My Cane - Mobile & Accessories on Can Using the Hypershell Exoskeleton on a Bike Replace an E-Bike? I Tested It to Find Out
  2. The media starts receiving the first Trump Mobile T1 Phone units, launch is imminent - Mobile & Accessories on The Competitive Moat That AI Can’t Replicate
  3. Samsung’s giant The Frame Pro TV is $1,500 off until midnight - Mobile & Accessories on All Your Wearables Have One Glaring Weakness. What Can You Do About It?
  4. iPhone 18: Everything We Know About Apple's Most Ambitious Lineup Yet - Mobile & Accessories on This magnetic Qi 2.2 power bank is perfect for the iPhone 17 and it’s on sale right now
  5. Do Camera Sensor Sizes Matter? - Mobile & Accessories on Xiaomi 18 Pro set for a screen upgrade that Samsung fans will be very familiar with

Archives

  • October 2026
  • June 2026
  • May 2026
  • April 2026

Categories

  • Blog
  • Mobiles

Copyright © 2026 Mobile & Accessories.

Theme: Oceanly News by ScriptsTown